A digital architectural rendering of a modern 10-storey mixed-use condominium building at a street intersection during sunset. The building features a multi-toned facade with white panels on the lower levels and dark grey siding on the upper storeys. Prominent balconies with black metal railings line the exterior. The ground floor accommodates commercial storefront retail spaces with arched entryways, and pedestrians and cars are visible on the surrounding sidewalks and streets.
An architectural rendering illustrates a proposed mid-rise mixed-use residential building at 388 Concession Street. Credit: HANDOUT / Chamberlain Architect Services

Hamilton City Council is scheduled to vote in September on a zoning amendment to permit a 10-storey mixed-use building with 176 dwelling units at 388 Concession Street on the western edge of the only Hamilton Mountain business improvement area. The building will include 261 square metres of ground floor commercial space.

The City posted public notice on June 8, stating the application will be presented to Planning Committee on September 1, 2026. The City of Hamilton does not post application submissions to the Internet, and no further information has been made available.

The application was reviewed by Hamilton’s Design Review Panel (DRP) in December 2025. At the time, the application proposed the same number of residential units (176) and included a larger amount of commercial space at 293 square metres.

The applicant, Concession Property Corp. c/o Savan Chandaria and Sarit Chandaria, told the DRP the units would be rental tenure.

The stretch of Concession Street west of this site, between 222 Concession and 370 Concession, includes six apartment buildings. The vacancy rates for these buildings are among the lowest in Hamilton. All of these buildings have northerly views over Sam Lawrence Park with clear lines of sight to the Hamilton Harbour and beyond. 388 Concession is east of the park and will not have the same views.

The area is serviced by seven public transit routes which use the Jolley Cut to reach downtown Hamilton.

The City is accepting public comments until July 8, 2026 as part of the staff review process. Anyone can delegate at the Planning Committee meeting.

This publication has requested a copy of the planning application files.


Production Details
v. 1.0.0
Published: June 9, 2026
Last updated: June 9, 2026
Author: Joey Coleman

Update Record
v. 1.0.0 original version

Discussion

1 comment
Sort
  1. Kevin Simpson

    Hello, just wondering if anyone has done a review of the traffic , or traffic study along concession street as it is now. The traffic is already a major concern along this route as it is now. This would be a major concern with another high rise apartment building for the residents already living in this area . There is another high rise building under construction just blocks away on upper Wellington Street. It would be a wise decision to look into the traffic and congestion in this area as it stands at the.present time before going ahead with these decisions. There is also the juravinski hospital and cancer clinic that demands the traffic along concession street to be congested and backed up most of the day as it is. This problem already causes traffic to use side streets as major thorough fares to beat the traffic, often traffic speeding and not obeying stop signs it intersections. There is also Armstrong school where a large number of students walk and cross intersections to and from school. The extra traffic would surely cause a major safety concern. Please consider these concerns , it’s only a matter of time before there will be a major tragity. Thank you

    Reply ·

Add your perspective

Be civil, stay on topic, and disagree in good faith — all viewpoints are welcome. Comments are moderated. Read our comment policy

Not published.